Through this service, you can obtain the sewerage connection point drawing/ scheme for your plot.
| Service Channels | Service Time | Period | Fees | Customer Type |
|---|---|---|---|---|
| TAMM Platform | 7/24 | 2 working days | N/A |
|
• New Final Site Plan for the plot from the Municipality for no more than 6 months.
• The approval of the Abu Dhabi Sustainable Water Solutions Company of the basement extension or a letter from the assigned consultant stating that this project does not contain an extension to the basement outside the plot limits (for commercial plots).
• Login through TAMM Platform.
• Fill required information
• Upload required and documents and submit the request.
• Receive sewerage connection point details drawing or rejection with comment electronically.