Through this service, you can obtain an approval to modify the level of the sewage manhole located outside the limit of the plot.
| Service Channels | Service Time | Period | Fees | Customer Type |
|---|---|---|---|---|
| TAMM Platform | 7/24 | 40 working days | N/A |
|
• New Final Site Plan for the plot from the Municipality for no more than 6 months.
• Drawing showing the location of the manhole to be modified.
• Sewer services layout.
• Method statement of the work stamped by assigned Consultant and Contractor (if any).
• Cross-section drawing of the manhole to be modified (if any).
• Login through TAMM Platform.
• Fill required information and Upload required documents and submit the request.
• Receive approval for modification of the sewerage manhole level or rejection with comment electronically.